Gallery / Stairs

Once the location is established, soil behind the stair is removed, the wall cut, turn buckles positioned and staked to insure there is no shifting of the wall or stairs. The cut panel is removed and the stairs visually positioned. Cross checking for level is continual as the stairs are positioned to the appropriate height of the surrounding deck and/or coping. When the variables have been accounted for, the stairs are secured with galvanized screws and angle iron and the area under the stairs is back filled with vermiculite.

x